MARAFIQ

rajfp0yy4aqbj3s8evuq

Project Details

  • Rob’s house
  • Industrial
  • Marafiq
  • Yanbu
  • October 2007
  • November 2008

Project Description

The project involved the partial replacement of the force main line between IW 11 and IW 13 in Yanbu.

The works included the installation of a 1,000 mm diameter GRP pipeline and 1,000 mm diameter butterfly valves, as well as the construction of a concrete valve room and the execution of excavation, backfilling, and dewatering works.

h4fi49wgsqtoojbo4why
womaywghg6pm73byfkup
bouhusz0dewhexujghbr

Project Scope

The project scope covered pipeline replacement, valve installation, concrete works, and the associated civil and groundwater-control works required for the force main line.

Civil Works

Site preparation, structural works, road and parking perimeter.

Electromechanical

MEP works and installation of power IT/data systems.

External Utilities

Perimeter fence and external utility works.

Project Delivery Scope

Partial replacement of the force main line
Installation of 1,000 mm GRP pipeline
Installation of 1,000 mm butterfly valves
Construction of concrete valve room
Excavation and backfilling works
Dewatering works
Associated civil works