Ashar Tented Resort-RC Alula Project

06_Ashar

Project Details

  • Ashar Tented Resort-RC Alula
  • November 8, 2022
  • Others
  • Royal Commission for Al-Ula
  • Al Ula City
  • July 2020
  • July 2022

Project Description

The project consisted of a turnkey luxury resort with 47 villas, including 3-bedroom, 2-bedroom, and 1-bedroom villas, distributed across two wings: the north wing and the south wing.

Each wing includes a pavilion building, back-of-house building, kitchen, and restaurants including equipment setup. The works included structural works, high finishing materials, swimming pools, MEP, HVAC, BMS, security system, SPA facilities, secondary infrastructure, all connections, tanks, and biofilter facilities.

07_Ashar
01_Ashar
05_Ashar
04_Ashar
03_Ashar
04_Ashar

Project Scope

The project scope covered turnkey construction and delivery works for a luxury resort in Al Ula City.

Civil Works

Site preparation, structural works, road and parking perimeter.

Electromechanical

MEP works and installation of power IT/data systems.

External Utilities

Perimeter fence and external utility works.

Project Delivery Scope

Turnkey luxury resort delivery
Construction of 47 villas
North and south wing development
MEP, HVAC, BMS, and security systems
Secondary infrastructure and utility connections
Pavilion and back-of-house buildings
Kitchen and restaurant equipment setup
Structural works and high finishing materials
Swimming pools and SPA facilities
Tanks and biofilter facilities