Project Details
- Ashar Tented Resort-RC Alula
- November 8, 2022
- Others
- Royal Commission for Al-Ula
- Al Ula City
- July 2020
- July 2022
Project Description
The project consisted of a turnkey luxury resort with 47 villas, including 3-bedroom, 2-bedroom, and 1-bedroom villas, distributed across two wings: the north wing and the south wing.
Each wing includes a pavilion building, back-of-house building, kitchen, and restaurants including equipment setup. The works included structural works, high finishing materials, swimming pools, MEP, HVAC, BMS, security system, SPA facilities, secondary infrastructure, all connections, tanks, and biofilter facilities.
Project Scope
The project scope covered turnkey construction and delivery works for a luxury resort in Al Ula City.
Civil Works
Site preparation, structural works, road and parking perimeter.
Electromechanical
MEP works and installation of power IT/data systems.
External Utilities
Perimeter fence and external utility works.
Project Delivery Scope
Turnkey luxury resort delivery
Construction of 47 villas
North and south wing development
MEP, HVAC, BMS, and security systems
Secondary infrastructure and utility connections
Pavilion and back-of-house buildings
Kitchen and restaurant equipment setup
Structural works and high finishing materials
Swimming pools and SPA facilities
Tanks and biofilter facilities
