SADARA CHEMICAL PLANT

sg9686geq0w1j79xfgnk

Project Details

  • SADARA CHEMICAL PLANT
  • July 1, 2013
  • Industrial
  • Tecnicas Reunidas Saudia for Services and Contracting Co. Ltd.
  • SADARA Petrochemical Plant, 2nd Industrial City, Jubail, KSA
  • July 2013
  • February 2017

Project Description

The project included reinforced buildings with hollow-core slabs and steel structures with pre-cast cladding, spread across three separate areas and three separate contracts, comprising 13 total buildings. The buildings support the smooth operation of SADARA, a world-class petrochemical plant and joint venture between Saudi Aramco and Dow Chemical Company.

This lump-sum turnkey EPC project included blast-proof and other building types, switchgears, HVAC, firefighting systems, BMS, and related works, while integrating high safety and quality standards with planning and control practices for efficient construction.

y1mk4xdnwlr7hjac1lrb
unel9lqzzaj8xeyateg8
sg9686geq0w1j79xfgnk
htjyirifzz33mkn0bq92
esz7f9cbp8xf4zzre7cl

Chemical Operations Served

The project scope covered the construction of 13 buildings serving three chemical operations within the SADARA Petrochemical Plant.

Civil Works

Reinforced buildings, hollow-core slabs, steel structures, and pre-cast cladding.

Electromechanical

Switchgears, HVAC works, firefighting systems, and BMS.

Project Logistics

Construction of 13 buildings across three separate areas under a tight schedule.

Project Delivery Scope

Lump-sum turnkey EPC project
Construction of 13 total buildings
Reinforced buildings with steel structures
Pre-cast cladding works
Blast-proof and normal building types
Switchgears, HVAC, firefighting, and BMS
Works across three separate areas
High safety and quality standards