Project Details
- Marjan Increment Program – TR – TCF and Satellite Offices
- Tecnicas Reunidas / Saudi Aramco
- Temporary Facilities
- Tanajib, KSA
- December 2019
- August 2020
Project Description
The project involved the construction of site facilities for Tecnicas Reunidas, including 22,000 m² of camp and main offices for TR and ARAMCO facilities.
The works included site preparation, fences and gates, asphalt and walkways, furniture and HVAC, and complete utilities consisting of water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps, and related works.
The project also included the construction of 8,000 m² steel-structure warehouses with 2,000 m² closed refrigerated stores, complete with site preparation, fences and gates, asphalt and walkways, furniture, HVAC, and complete utility networks.
Camp & Offices
Construction of 22,000 m² camp and main offices for TR and ARAMCO facilities.
Warehouses
Construction of 8,000 m² steel-structure warehouses with 2,000 m² closed refrigerated stores.
Utility Networks
Water, firefighting, power networks, fire alarm, piping, tanks, cables, lighting, generators, and pumps.
Project Delivery Scope
Construction of camp and main offices
Construction of steel-structure warehouses
Construction of closed refrigerated stores
Site preparation and external works
Fence, gates, asphalt, and walkways
Furniture and HVAC works
Complete water, firefighting, and power networks
Fire alarm, piping, tanks, cables, lighting, generators, and pumps
Related utility works