Project Details
- Harad Gas Plant – Satellite Offices
- Tecnicas Reunidas / Saudi Aramco
- Temporary Facilities
- Harad, KSA
- May 2018
- July 2019
Project Description
The project involved the construction of TR and Aramco satellite offices with a total area of 12,000 m² across 17 different locations.
The works included site preparation, fences and gates, asphalt and walkways, furniture and HVAC, and complete utilities consisting of water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps, and related works. The project also included recreational and dining facilities, gymnasium, and sport facilities as a complete turnkey project.
Site Facilities
Satellite offices, furniture, HVAC, recreational and dining facilities, gymnasium, and sport facilities.
Utility Networks
Water, firefighting, power networks, fire alarm, piping, tanks, cables, lighting, generators, and pumps.
External Works
Site preparation, fences, gates, asphalt works, and walkways across 17 locations.
Project Delivery Scope
Construction of satellite offices
Works across 17 different locations
Site preparation and external works
Fence, gates, asphalt, and walkways
Furniture and HVAC works
Complete water, firefighting, and power networks
Fire alarm, piping, tanks, cables, and lighting
Generators, pumps, and related systems
Recreational, dining, gymnasium, and sport facilities