Fadhili TR – Main Offices and Laydown Area

3-11-thegem-product-justified-square-xl

Project Details

  • Fadhili TR – Main Offices and Laydown Area
  • Tecnicas Reunidas / Saudi Aramco
  • Temporary Facilities
  • Fadhili, KSA
  • May 2016
  • April 2017

Project Description

The project involved the construction of office facilities for Saudi Aramco and Tecnicas Reunidas, with a total area of 7,000 m².
The works included site preparation, fences and gates, asphalt and walkways, furniture and HVAC, and complete utilities consisting of water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps, and related works.

1-11-thegem-product-justified-square-xl
2-11-thegem-product-justified-square-xl
4-11-thegem-product-justified-square-xl
5-10-thegem-product-justified-square-xl
6-9-thegem-product-justified-square-xl

Site Facilities

Office facilities, warehouses, closed refrigerated stores, furniture, and HVAC works.

Utility Networks

Water, firefighting, power networks, fire alarm, piping, tanks, cables, lighting, generators, and pumps.

External Works

Site preparation, fences, gates, asphalt works, and walkways.

Project Delivery Scope

Construction of office facilities
Construction of steel-structure warehouses
Closed refrigerated store facilities
Site preparation and external works
Fence, gates, asphalt, and walkways
Furniture and HVAC works
Complete utility networks
Fire alarm, lighting, generators, pumps, and related systems